← All services in National City
Kitchens

Kitchen remodeling in National City, CA

We remodel kitchens across National City and the rest of San Diego County. Most projects run 4 to 8 weeks from demo to final walkthrough, and we pull every permit in your name. Same family that started in 1987, same in-house crew on the job every day.

What's included

Full kitchen remodels with cabinets, countertops, flooring, and layout changes. We handle the whole job in-house, from rough-in to final walkthrough.

  • Custom cabinets installed by our crew
  • Quartz, granite, butcher block countertops
  • Flooring sized to the rest of the home
  • Layout changes, walls down, islands added
  • Permits and inspections handled
Get a free kitchen estimate in National City
Modern kitchen remodel with white cabinets and quartz waterfall island by 5 IN 1 Construction

Why National City chooses 5 IN 1 Construction

National City is one of the oldest cities in San Diego County (incorporated 1887) with a housing stock that goes back to the early 1900s. Many craftsman bungalows, mid-century post-and-beam homes, and 1950s ranchers. Remodels here often involve older plumbing (galvanized supply lines, cast-iron drains) that should be addressed when walls are open. Permits go through the City of National City Engineering and Building Department.

We have been remodeling National City homes since 1987. The Carrasco family runs every job site, the same in-house crew handles your project from rough-in to final walk, and we pull every permit in your name. No subcontractors, no surprise fees, and a one-year workmanship warranty.

Neighborhoods we serve

  • Olivewood
  • Lincoln Acres
  • Granger Hills
  • Sweetwater Heights
  • Old Town National City

ZIP codes: 91950

Common questions

How much does a kitchen remodel cost in National City?+

Most kitchen remodels in National City run between $25,000 and $60,000 depending on cabinets and finishes. We give you a written quote after the in-home estimate so you know the number before any demo work starts.

How long does a kitchen remodel take?+

Most kitchen remodels take 4 to 8 weeks from demo to final walkthrough. Cosmetic refreshes are faster (1 to 2 weeks). Heavy layout changes with structural work can run 10 to 12 weeks. We give you a realistic timeline before signing.

Do I need a permit to remodel my kitchen in National City?+

If you are moving plumbing or gas lines, changing electrical, or removing walls, you need a permit in National City. We pull it in your name and meet inspectors. Cabinet-and-counter swaps with the existing layout usually do not need one.

Do you help with the design?+

Yes. We walk through layout options on the first estimate visit and pull samples for cabinets, countertops, and tile. For complex remodels we bring in a designer for cabinet layouts at no extra cost.

What kitchen styles work best in National City homes?+

In National City, the most common requests we see are white shaker cabinets with quartz tops, two-tone kitchens with navy or sage lowers, and warm-wood transitional styles. We can pull recent project photos from your neighborhood.

Ready for kitchen remodeling in National City?

Free in-home estimate. Written quote within 48 hours. Victor or Julian Carrasco will be there in person.

Get free estimate
Call (619) 555-0000